The office building is the fourth building in the Campus 6 project.
The name of the building is Campus 6.4 and its construction will be completed in the year 2022.
The project that includes this building also has a running track located on the top floor of the Campus 6.1 building.
Also this campus has an excellent connection to all means of public transport: Metro, tram, bus.
Address Campus 6.4
Details Campus 6.4
Building year: 2022
Office class: A
Disponibility: Q4 2025
Minimum leasable area: 500sqm
Maximum leasable area: 21320sqm
Built surface: 21320sqm
Usable surface: 500sqm
Amenities Campus 6.4
Air conditioning: Fresh air, 4-pipes climate control
Architecture: Glass curtain, Hone, Bathrooms furnished and equipped, Programmable destination elevator, Carpet, Raised floor, Fake ceilling
Building facilities / proximities: Bus stop nearby, Shopping center nearby, Subway station nearby, Tram station nearby
ECO elements: Building management system, Green Building Certification, Modern / silent equipment, Ventilated facade, Electric car charger, Bicycle parking, Intelligent electrical system, Intelligent lift system
Electrical system: Individual electrical control for each office, Emergency generator
IT&C: Internet, Phone
Safety and security: Secure parking access, Server room, CCTV, Secure card-based access control, Access zone control, Smoke detectors, Sprinklers, Permanent guard, Reception, Parking traffic lights, Server room with racks, ventilation and access control, Alarm system, Evacuation system, Integrated BMS security systems
Services provided in the building: Wheelchair access, Real estate management and administration, Bathroom consumables, Separate metering, Exterior cleaning, Parking cleaning, Common space cleaning, Snow removal, Green space maintenance, Sanitation, Elevetor maintenance and repairs, Ventilation system